REST® Evercool®+ Cooling Pillowcases King by REST

REST® Evercool®+ Cooling Pillowcases King

$110.14
Sale price  $110.14 Regular price 
Skip to product information
REST® Evercool®+ Cooling Pillowcases King by REST

REST® Evercool®+ Cooling Pillowcases King

$110.14
Sale price  $110.14 Regular price 

Product Overview

The REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin, Silver Infused Fabric for Hygienic Sleep, Silky Smooth for Curly Hair, High Elastic for Snug Fit (19x35 inches) achieves skin-friendly experience through long-lasting engineering, making it dependable for master bedrooms. Engineered using Evercool+ Performance Fabric, measuring King (2 pcs), available in Lavender Breeze. Notable features include instant cooling and cooling experience, contributing to its temperature-regulating character.

Key Features

  • Instant Cooling: Experience sleeping on the cold side of the pillow with Rest’s advanced cooling pillowcases; Wake up refreshed and rejuvenated with cutting-edge performance fabric that offers instant and long-lasting cooling sensation; Evercool pillowcases are ideal for all seasons and hot sleepers with night sweats, hot flashes
  • Luxuriously Soft and Smooth: Science-backed fabric innovation that’s softer, smoother and stronger than silk; Glides effortlessly against your skin for frictionless sleep and prevent crush wrinkles caused by side sleeping; Elevate your sleep with unbelievable comfort
  • Always a Good Hair Day: Reduce friction, prevent frizz and hair damage with Evercool’s ultra-fine, super smooth fabric; Curly and wavy hair approved with our anti-static cooling pillowcases that don’t pull or tug; Don’t wake up tired or with messy hair ever again
  • Self-Cleaning Fabric Tech: Lasting hygienic pillowcases for sensitive skins. With Noble's Ionic+ extruded silver yarn technology, positively charged silver ions are permanently embedded into Evercool+ fiber; The pillow case is self-cleaning to effectively inhibit and eliminate odor
  • Stain Resistant: Resistant to oil absorption; The pillowcases will always look and feel brand new, without stains or color fading; Plus, you can rest assure any skin care products will stay where they belong, and you can look and feel your best

Why Choose the REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin

For buyers prioritizing restful sleep, the REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin, Silver Infused Fabric for Hygienic Sleep, Silky Smooth for Curly Hair, High Elastic for Snug Fit (19x35 inches) offers cozy construction paired with instant cooling. Few pillowcases products combine these elements as effectively.

Best For

The REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin is best suited for: all seasons and hot sleepers with night sweats.

Quick Summary

The REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin is a Pillowcases product by REST. Size: King (2 pcs). Material: Evercool+ Performance Fabric. Brand: REST. Color: Lavender Breeze. Product Care Instructions: Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/no heat or line dry. 2) Don't use iron. 3) Don't dry clean. Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabr… See more. Price: $110.14.

Product Specifications

Specification Details
Size King (2 pcs)
Material Evercool+ Performance Fabric
Brand REST
Color Lavender Breeze
Product Care Instructions Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/no heat or line dry. 2) Don't use iron. 3) Don't dry clean. Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabr… See more

You may also like